Construction quote template: what a construction quote has to show, and the lines the estimator prints for the owner

Updated

A construction quote template is the estimate turned to face the owner: the same lines, the building at the contractor's cost per square foot, the site work, the contingency, the overhead and profit, with the scope stated, the exclusions listed, the validity dated and the terms of payment written down. A construction proposal template is the same document with the contractor's approach described above the numbers. The distinction the search quote vs estimate is asking about is real: an estimate is the contractor's best figure for the work, a quote is a price the contractor offers to do it for. This page says what the quote has to show, works it on the hub's example, and points at the free construction cost estimator on this site that prints the lines the quote is built from, with no account.

Quote vs estimate: which document this is

An estimate is the contractor's figure for what the work will cost, written from quantities and rates, and it can move as the drawings and the site are better known. A quote is a price offered for a stated scope, and once accepted it is what the contractor has agreed to do the work for, subject to the changes the contract allows. The arithmetic is the same; the commitment is different, and the document should say which it is on its face. A construction quote template that does not state its validity and its scope has left the owner to decide which it was; the Small Business Administration's guidance on managing a business's finances, linked below, is the plain-language reference for why the distinction matters on the day the number is disputed.

The lines a construction quote has to show

The scope in a paragraph the owner can read; the building at the contractor's own cost per square foot, with the square footage stated; the site work as its own figure; the contingency at the contractor's percentage; the overhead and profit at the contractor's percentage; the total; the exclusions, the things the price does not include, named; the validity, the date after which the price is withdrawn; the payment terms, including the draw schedule and the retainage; and the signature lines. On the hub's worked example the lines are $330,000 of building, $25,000 of site work, $35,500 of contingency and $58,575 of overhead and profit, a $449,075 total, and the estimator on this site prints them in that order.

The construction proposal template: the approach above the numbers

A proposal is the quote with the contractor's plan for the job set out first: how the work will be sequenced, what the crew is, how long each stage takes, what the owner has to supply and when, and what happens when the site is not what the drawings said. It is the document a small contractor uses when the price alone will not win the job, and the numbers under it are the quote's numbers, unchanged. A construction proposal template is therefore the quote template with three or four paragraphs above it and the same lines below; the arithmetic does not change because the paper got longer.

From the quote to the contract and the draw

When the quote is accepted its lines become the schedule of values, the list of the contract's parts with a value on each that the draws are billed against; the payment terms in the quote are the draw schedule and the retainage the schedule of values carries; and the exclusions are the things a change order will price later. The free construction cost estimator on this site prints the quote's lines from the contractor's own figures, and the schedule-of-values draw on this site works each period's payment from them, so the quote the owner signed and the draw the owner pays are the same numbers at two dates.

Questions people ask about construction quote template

What is the difference between a quote and an estimate?

An estimate is the contractor's best figure for the work and can move as the job is better known; a quote is a price offered for a stated scope that the contractor agrees to do the work for once accepted. The document should say which it is, with its validity dated.

What should a construction quote template include?

Scope, the building at the contractor's cost per square foot, site work, contingency, overhead and profit, the total, the exclusions, the validity date, the payment terms with the draw schedule and retainage, and signature lines.

How is a construction proposal template different?

It sets out the contractor's approach, sequence, crew, timing and the owner's obligations above the same numbers. The quote's lines do not change.