Construction cost estimator
- Estimate to the owner
- $449,075
- Building, at your cost per square foot
- $330,000
- Direct cost with site work
- $355,000
- Contingency
- $35,500
Every figure on this page is computed from the inputs you enter, by the method stated below it. DrawScheduleWorks publishes no market costs, no concrete prices and no survey: the defaults are a worked example to replace with your own.
The figures above start from a worked example ($449,075). Change any input and the answer updates as you type.
Download the Construction cost estimator worked example (CSV)
This estimates a build in the order the owner's lender reads it. Conditioned area times your own cost per square foot is the building; site work, utilities and permits on their own line make the direct cost; contingency as a percentage of the direct cost is what the unknowns get; overhead and profit on the whole is the last line; and the total is the estimate to the owner. Every figure is yours; the tool publishes no market cost. Free, on the page, no account; the paid plan saves it against the client and the project.
Area times your cost per square foot, both on the page
The building line is the conditioned area times your cost per square foot, and the rate is yours from the last jobs of this type, because a published average has never seen your subs, your market or the owner's finishes. Both numbers are on the estimate so the lender can see what is behind the building figure.
Site work on its own line, contingency on the direct cost
Site work, utilities and permits depend on the lot and not on the square feet, so they are their own line and the direct cost is the building plus the site. Contingency is a percentage of that direct cost, agreed before the job starts, shown as a line so the owner sees it and sees it come back if it is not spent.
Overhead and profit on everything above it, then the total
Overhead and profit rides on the direct cost plus the contingency, because the office and the margin carry the whole job including its risk. It is the last line before the total, and the total is the estimate to the owner, the figure the contract sum will become. The paid plan keeps it against the client so the draws start from it.
Construction cost estimator: common questions
Is this a free construction cost estimator?
Yes. Enter the area, your cost per square foot, the site work, the contingency and the overhead and profit percentages, and it builds the estimate on the page with every line and the total, no account and no card. Print it as it stands. DrawScheduleWorks Pro adds your business name and logo, a PDF without our line, and saving it against the client.
What cost per square foot should I use?
Your own, from the last jobs of this type divided by their conditioned area, adjusted for what has changed since. The worked example uses $165 to show the arithmetic; the tool publishes no market cost, because the number depends on your market, your subs and the owner's finishes, none of which a website has seen.
Should contingency be shown to the owner?
Shown as a line, in most contracts: the owner sees what is set aside for the unknowns and sees it returned if it is not spent, and the lender wants it visible. Folding it into the rate makes the building look expensive for no stated reason. The tool shows it as its own line.
DrawScheduleWorks Pro
Keeping what you make
The paperwork is free forever. Pro turns it into your record: your name and logo on it, no watermark, every estimate and draw filed against the client and the project, your rates remembered, and a clean export when the owner's lender or the accountant asks.
- Download as PDF
- No DrawScheduleWorks watermark
- Save every project and reopen it later
- Your logo and license on it
- Export every project in one go
- Draw-due reminders emailed to your clients
- Connect your own Stripe account and get paid online
- Connect your QuickBooks Online or Xero
$39per month, whole crew
Start DrawScheduleWorks Pro PricingRenews monthly at the price above until you cancel. We email you before any price change.
Cite or embed this figure
Construction cost estimator (Estimate to the owner): $449,075, DrawScheduleWorks, worked example.
Cite as: "Construction cost estimator, DrawScheduleWorks", updated 2026-09-03, https://drawscheduleworks.com/tools/construction-cost-estimator/.